Live Stoner Chat Live Stoner Chat - Oct-Dec '25

Live Stoner Chat
Ac infinity 3x3 but I got their board light for a 4x4 so I dont have to run it at 100%. Save a little bit of power, not much though.
Same tent, it fits perfectly in that closet...

A few light leaks in the zipper which get some duct tape with photos but I like the flap for certain cables.

Ive been looking for bar lights that fit. The 300w COB work great but they get HOT.
 
Same tent, it fits perfectly in that closet...

A few light leaks in the zipper which get some duct tape with photos but I like the flap for certain cables.

Ive been looking for bar lights that fit. The 300w COB work great but they get HOT.
Idk if you like ac lights. But their ionframe 6 is the same size as the s44 board style lights just about 120w more power. Ive been thinking about it but I never have enough money on hand. Maybe when tax returns come
 
I did this with pvc and zip ties....saved me 50 bucks
Ya and since this is for him to be able to hang plant yo-yos from could literally just tie a rope from one pole to the other to hang them from!
 
Here's my attempt at a DIY freeze-dry rig for ice water hash. The vacuum chamber is 4" PVC pipe that fits in the freezer, hooked up to a regular air conditioning vacuum pump, using 1/8" copper tubing that fits under the gasket of the deep freeze. I don't have a very good gauge to measure vacuum, but it boils water at room temperature, so it should sublimate frozen moisture at -10°F in the deep-freeze (-23°C).

The wife would rather I be finishing the upstairs bathroom instead of fooling with my canna experiments. Next up is to upgrade the 1-1/4" lead shower drain to code, which is 2" PVC (see work light in the 2nd pic). Right @PinkyNotTheBrain ? Maybe I'll try a hash run first, the bathroom project has already waited since I got this house in 1992...
View attachment 1766344
View attachment 1766345
Yup. Have the boss pick out the tub first for waste and overflow meas. Make sure you gonna have room for everything . Where's the drain run? It wasn't running over to that stack huh?
 
That’s what we did when we redid our bathroom upstairs 4” pvc main line in the basement to 3” going up to second story then 2” off that for shower and sink 3” went all way to the toilet. Now that I’m thinking about it maybe it’s 6” down to 4” but I do know the shower and sink have 2” running to them
Run should be in 2" on a tub but u usually have to reduce for waste and overflow at 1 1/2". Not always but usually
 
Back
Top