jackmc
Killing them softley
I'd put 2 20A legs into one duplex box or two singles. I have this in my shop and I plug a 12" chop saw and a table saw into the same gang of 4 outlets and can run both at the same time. It will be a lot cheaper than a sub panel. If your handy you could even build yourself two large extension cords that you feed into your panel. If you have basement or attic access adjoining the room you want power in it might be easy. Just make sure to always turn the power off, working on live circuits is stupid.
