@Stinky_Jones here are some pics of the res and going into the tent just got the last of the girls out today so will get pics of the inside this morning after work. But a parts list I used is this I used a couple extra things I did not end up needing so I will leave those out but you might see it in the photos.
2- 10ft sticks sch 80 3/4 pvc (adjust per distance you wanna run)
2- active aqua 400gph pumps one for circulation the other for feed hose barbs come with pumps.
2in piece of 3/4 air hose
1- 3/4 hose barb to pvc connection. (This is not the ones with the pumps this will have to be bought separate to connect the pump to the pvc system)
4-90 degree sch 80 elbows
4-t fitting sch 80 pvc
1-sch 80 3/4 ball valve (this was for the extra part I have off the side for filling jugs if I want)
1-union ball valve has union connection on both ends of a ball valve these are very nice.
1-3/4 sch 80 cap for plugging off the end of pvc.
3- pieces of threaded pvc (I used threaded pvc for the 3 t fittings I have inside my tent for easy removal if desired but can use regular pvc style fitting as well)
3-threaded t fittings
6-reducers from 3/4 to 1/4
6 brass reducers from 1/4 to 3/16 hose barb
black 1/4 hose from hydro shop is what I used from and made my own drip rings with plastic t fittings from Walmart poked holes all through bottom side of hose with heated safety pin. Any other questions feel free to ask I'll get the pics of the inside pvc this morning